FAQ for windows GUI client
I. Storage Task Fails to Start
This is usually caused by network issues. Please check your network connection or switch to a different network before retrying.
II. PCDN Task Fails to Run Nodes
Ensure you have restarted your computer after installing the client to activate service configurations.
If you are running the node via a cmd terminal window, close the terminal first.
Avoid Chinese characters, spaces, or special symbols in the installation path. Reinstall the program after adjusting the path.
Agent service may fail to download due to low network speed. Check your network or switch to a different network.
III. PCDN Service Status: Offline
If nodes are restarted repeatedly within short intervals and show "offline" status, this typically indicates abnormal virtual machine service startup. The system will automatically attempt to restart.
Wait patiently for 30 minutes. If still offline, restart your computer and retry, or contact community support.
IV. PCDN Service Status: Deployment Failed (*multipass not installed)
This issue usually occurs due to virtual machine download failure caused by low network speed.
Solution:
Stop the PCDN task in the client.
Press
Win + R
, typecmd
, and press Enter to open the DOS window.Run
multipass list
to check the virtual machine status:If status is
Stopped
: Runmultipass delete ubuntu-nilink -p
.For other statuses: Run
multipass stop ubuntu-nilink --force
first, then execute the command above.
Restart the PCDN task. The system will re-download the virtual machine and run the node.
V. High Bandwidth Consumption
PCDN nodes share bandwidth to generate rewards, resulting in high traffic. Device operations may feel sluggish.
Use idle networks/devices where possible. If normal usage is impacted, temporarily disable the PCDN task.
VI. Poor Network Performance Without PCDN Tasks Running This is typically caused by virtual machine services not terminating properly or abnormal client closure.
Solution:
Press
Win + R
, typecmd
, and press Enter.Run
multipass list
to check the virtual machine status:If status is
Stopped
: No action needed.For other statuses: Run
multipass stop ubuntu-nilink --force
.
VII. Storage & PCDN Tasks Simultaneously Running Cause Disconnections
Usually caused by insufficient device resources. Check Resource Monitor—high memory usage indicates resource shortage. Workaround:
Run the PCDN task first. After stabilizing, enable the Storage task.
Alternatively, use a higher-specification device.
VIII. High Disk Space Usage
Storage tasks generate rewards by sharing disk space, which consumes storage.
To clean up space:
Go to Settings > Task Settings
and perform disk cleanup.
IX. Contact Community Support
For unresolved issues, contact community technical support. Required information:
Node ID
Operation logs (Export path: Client > Settings > Operation Logs menu)
TG ID: @paul_smir
Telegram Channel ✈️
Discord 🎃
Email 📮
titan@titannet.io
最后更新于